Phase one: rough clean
After framing, drywall and mechanicals, before finishes go in. Debris removal, sweeping, gross dust knockdown and clearing the space so finish trades can work in it. This is about access, not appearance.
Serving Omaha, Nebraska & surrounding areas
Mon–Fri 8am–6pm · Sat 9am–2pm
Three-phase construction cleanup that takes a finished build from dust and debris to handover condition.
Drywall dust behaves unlike normal soil. It is fine enough to stay airborne for hours, it settles into every horizontal surface repeatedly, and it turns to paste when it meets water, which is why a single wet wipe often makes a window worse rather than better. Post construction cleaning in Omaha is a specific discipline, and crews without the right vacuums and sequence usually end up doing the same room three times.
The sequencing matters as much as the technique. Cleaning before the trades have genuinely finished means cleaning again after the punch list, and cleaning a floor before the ceiling work is complete is simply wasted labor. We coordinate with your general contractor so each phase happens when it actually helps, rather than when it appears on an optimistic schedule.
We handle tenant improvements, office build-outs, retail fit-outs and renovation work across the Omaha metro, from downtown build-outs to new construction in the western suburbs. Most projects need the full three phases, though a small renovation may only need the final clean.
After framing, drywall and mechanicals, before finishes go in. Debris removal, sweeping, gross dust knockdown and clearing the space so finish trades can work in it. This is about access, not appearance.
After trades finish and before handover. Full detail on every surface: HEPA vacuuming, wet wiping, window and glass work, fixture cleaning, floor finishing and the removal of every sticker and label.
After the punch list is completed and immediately before occupancy or a client walkthrough. Re-cleans anything disturbed by punch work and catches what settled after the final clean.
The final clean is where a build either looks finished or looks nearly finished. These are the items that decide it.
Dust removal from every surface, top down: Ceilings, vents, light fixtures, ledges, door frames, then walls, then fixtures, then floors last. Working out of order means repeating the whole sequence.
HEPA vacuuming, not shop vacuums alone: Standard vacuums exhaust fine dust straight back into the air, which is why a room can look clean and be covered again by morning. HEPA filtration is what stops the cycle.
Sticker, label and adhesive removal: Windows, appliances, fixtures, sinks and equipment arrive covered in labels and protective film. Removing them without scratching glass or stainless is slow, careful work and the most commonly underestimated part of the job.
Window and glass detail: Interior and exterior glass, frames and tracks, including the paint specks, adhesive residue and construction film that ordinary window cleaning does not address.
Paint, caulk and compound spot removal: Overspray, drips and joint compound on floors, fixtures, hardware and glass, removed with methods matched to the surface underneath.
Floor finishing: New floors need their protective residue removed and, depending on the surface, initial sealing or finish coats applied. Getting this right at handover sets up the floor's whole maintenance life.
Restroom and fixture commissioning: New fixtures cleaned of manufacturing residue, labels and dust, with everything polished and ready for first use.
Post construction cleaning in Omaha commonly runs about $0.30 to $0.80 per square foot for a final clean, with full three-phase projects typically between $0.50 and $1.20 per square foot overall. A 5,000 square foot office build-out often lands somewhere around $2,000 to $4,500 for the complete sequence.
The variables are dust volume, window count, floor type and how much adhesive and label work is involved. Buildings with extensive glazing take considerably longer, because glass detail is slow. Projects where trades have left significant debris also cost more, since removal precedes cleaning.
We review the plans or the site with your project manager, establish square footage, glass count and surface types, and agree where our phases fit the build schedule.
Cleaning phases are tied to trade completion rather than fixed dates, because construction schedules move. We stay in contact so we arrive when the work is genuinely ready.
Debris clearing and dust knockdown that lets finish trades work efficiently, with waste handled according to the site's disposal arrangements.
The full detail sequence, top to bottom, with HEPA filtration throughout. This is the largest phase and it is scheduled with realistic duration.
A final pass after punch work, timed close to occupancy or client walkthrough so the space is presented at its best.
The final clean should happen after all trades are genuinely finished, including paint touch-ups and fixture installation, and before flooring protection comes up. Booking it too early is the most common and most expensive scheduling mistake, because it means paying for the same clean twice.
We remove general debris, packaging and waste as part of the rough clean. Large material, hazardous waste and anything requiring specialized disposal remains the contractor's responsibility, and we agree that boundary before starting.
Usually because fine dust is still airborne, or because a non-HEPA vacuum has been recirculating it. It also happens when cleaning starts before ceiling and mechanical work is complete. We use HEPA filtration and clean top-down for exactly this reason, and the touch-up phase exists to catch what settles late.
Yes, and it is common on tight schedules. Sectioned cleaning lets finished areas be completed while work continues elsewhere. It is less efficient than a clear site, so it costs a little more, but it often protects the handover date.
Yes. Labels, protective film and adhesive residue on windows, appliances and fixtures are part of the final clean. It is slow work requiring the right solvents and blades so glass and stainless are not scratched, and it is worth doing properly.
We remove installation residue and can apply initial finish or sealer where the flooring manufacturer specifies it. Getting the first treatment right matters, because it establishes the maintenance cycle for the life of the floor.
Ongoing janitorial contracts with an assigned crew, a written scope and managed supplies, so your…
Cleaning built around how offices actually run, from desk surfaces and conference rooms to the breakroom…
Strip and wax, burnishing, carpet extraction, tile and grout restoration, matched to the surface you…
A detailed reset that reaches what routine cleaning does not: vents, baseboards, high dusting, appliance…
Interior and exterior commercial glass on a schedule that keeps storefronts and offices looking…
Cleaning built for industrial floor plates: ride-on scrubbing, high bay dusting, dock areas and…
Scheduled janitorial service for offices, retail and facilities across Omaha…
Kitchen, dining room and back-of-house cleaning scheduled after close, built around health inspection…
Building-wide cleaning for property managers: lobbies, corridors, elevators, stairwells and tenant…
Cleaning for clinics, dental and specialty practices with documented disinfection protocols and correct…
Store and shopping center cleaning timed around trading hours, focused on entries, sales floors and the…
Tell us the square footage, the phase you need and your target handover date. We will walk the site with your project manager and schedule around the trades.